SL. NO. | JOB DESCRIPTION | CUSTOMER |
---|---|---|
1 | INSTALLATION & COMMISSIONING OF DUST EXTRACTION AND DUST SUPPRESSION SYSTEM OF CHP OF WANAKBORI THERMAL PLANT – G. E. B. – GUJRAT | ANDREW YULE & CO. LTD (A.P.C.UNIT.) |
2 | INSTALLATION & COMMISSIONING OF DUST EXTRACTION AND DUST SUPPRESSION & VENTILATION SYSTEM OF C.H.P OF DURGAPUR PROJECT LIMITED (W.B.) | ANDREW YULE & CO. LTD (A.P.C.UNIT.) |
3 | INSTALLATION & COMMISSIONING OF DUST EXTRACTION AND DUST SUPPRESSION & VENTILATION SYSTEM OF C.H..P OF FARAKKA S.T.P.P./NTPC (W.B.) | ANDREW YULE & CO. LTD (A.P.C.UNIT.) |
4 | INSTALLATION & COMMISSIONING OF ESP & DPAC SYSTEM OF FOB OF MAIHAR CEMENT, MAIHAR, (M.P.) | FLAKT INDIA LTD. |
5 | INSTALLATION & COMMISSIONING OF ESP OF WASTE HEAT BOILER OF PRAKASH INDUSTRIES LTD. CHAMPA.(M.P.) | FLAKT INDIA LTD. |
6 | FABRICATION, INSTALLATION 7 COMMISSIONING / OF ESP AND G.C.T./OF SAMCOR GLASS LTD. KOTA-RAJASTHAN. | FLAKT INDIA LTD. |
7 | INSTALLATION & COMMISSIONING OF BAGFILTER & DPAC SYSTEM OF A.P. RAYON- KAMALAPURAM – (A.P.) | FLAKT INDIA LTD. |
8 | INSTALLATION & COMMISSIONING OF BAGFILTER & DPAC SYSTEM OF BALLARPUR INDUSTRIES LTD. ASHTI- PLANT. MAHARASTRA. | FLAKT INDIA LTD. |
9 | INSTALLATION & COMMISSIONING OF REVERSE AIR BAG HOUSE OF C.H.P. OF PRAKASH INDUSTRIES LTD CHAMPA (M.P) | FLAKT INDIA LTD. |
10 | FABRICATION, INSTALLATION & COMMISSIONING OF DRY PNEUMATICALLY ASH CONVEYING SYSTEM (3 STREAM) BADARPUR THERMAL POWER PLANT/ NTPC (NEW DELHI) | FLAKT INDIA LTD. |
11 | FABRICATION, INSTALLATION & COMMISSIONING OF FUME TREATMENT PLANT- LINE NO, 7 OF HINDALCO INDUSTRIES, RENUKOOT (U.P.) | ASEA BROWN BOVERI LTD. |
12 | PART LEFT OVER INSTALLATION & COMMISSIONING OF LINE NO. – 3 OF HINDALCO INDUSTRIES RENUKOOT. (U.P.) | ASEA BROWN BOVERI LTD. |
13 | FABRICATION. INSTALLATION & COMMISIONING OF BOILER ESP OF MYSORE PULP & PAPER MILLS LTD.BHADRAVATI. (KARNATAKA) | THERMAX LTD. (ENVIRO DIVISION) |
14 | INSTALLATION & COMMISSIONING OF ESP & DPAC-SYSTEM OF INDIAN ALUMINIUM CO. CHOTAMURI UNIT.RANCHI (BIHAR) | THERMAX LTD. (ENVIRO DIVISION) |
15 | INSTALLATION & COMMISSIONING OF REVERSE AIR BAG HOUSE OF HI-TECH CARBON, RENUKOOT (U.P.) | THERMAX LTD. (ENVIRO DIVISION) |
16 | FIXING & ALIGNMENT OF COLLECING & EMITTING ELETRODES OF ESP OF GRASIM CEMENT, CHITTAURGARH. (RAJASTHAN) | THERMAX LTD. (ENVIRO DIVISION) |
17 | INSTALLATION & COMMISSIONING OF 4 NOS. ESP INTERNALS & OTHERS OF PLANT NO. 3 OF RAJASHREE CEMENT, GULBARGA- (KARNATAKA) | RAJASHREE CEMENT (INDIAN RAYON & INDIA LTD.) |
18 | OVER HAULING & MAINTENCE OF 4 NOS ESP OF PLANT NO. 1 OF RAJASHREE CEMENT GULBARGA-(KARNATAKA) | RAJASHREE CEMENT (INDIAN RAYON & INDIA LTD.) |
19 | EABRICATION, INSTALLATION & COMMISSIONING OF BOILER ESP OF POWER PLANT OF KANORIA CHEMICAL INDUSTRIES LTD. RENUKOOT (U.P.) | KIRLOSKAR SNYDER GENERAL LTD KIRLOSKAR AAF LTD. |
20 | INSTALLATION & COMMISSIONING OF 2 NOS, ESP AT HLL/ORAI/KANPUR | ASEA BROWN BOVERI LTD. |
21 | INSTALLATION 7 COMMISSIONING OF DRY PNEUMATICALLY ASH CONVEYING SYSTEM OF KYMORE CEMENT WORKS, (ASSOCIATED CEMENT COMPANIES LTD.) KATNI (M.P.) | ASEA BROWN BOVERI LTD. |
22 | INSTALLATION & COMMISSIONING OF ONE, ESP& NOS BAG FILTER & BAG HOUSE OF BIRLA PERICLASE,VIZAG. (A.P.) | ASEA BROWN BOVERI LTD. |
23 | OVESHAULING & MAINTENANCE OF ESP AT VASAB DATTA CEMENT, SEDAM, GULBARSA | VASAB DATTA CEMENT |
24 | OVESHAULING & MAINTENANCE OF ESP & BAG FILTERS AT BIRLA SUPER CEMENT, HUDGI,SOLAPUR, MAHARASTRA | BIRLA SUPER CEMENT |
25 | INSTALLATION & COMMISSIONING OF 2 NOS. ESP OF 500 MW BOILER OF CSTPS/MSEB | ASEA BROWN BOVERI LTD. |
26 | CIVIL & MECHANICAL WORKS OF DPAC SYSTEM AT NTPC/FGUTPP, UNCHAHAR | ASEA BROWN BOVERI LTD. |
27 | FABRICATION & ERECTION OF DE-DUSTING COLLECTING SYSTEM AT SWIL/ JHAGADIA, GUJRAT | FABRICATION & ERECTION OF DE-DUSTING COLLECTING SYSTEM AT SWIL/ JHAGADIA, GUJRAT |
28 | DISMANTLING OF RAW MILL ESP AND FABRICATION & ERECTION OF COOLER ESP AT JAYPEE REWA CEMENT AND SHUT DOWN WORKS ON DIFFERENT ITEMS. | JAYPEE REWA CEMENT |
29 | SUPPLYING SKILLED WORKERS FOR CEMENT PLANT OF RAJASHREE CEMENT GULBARGA, KARNATAKA | RAJASHREE CEMENT |
30 | SUPPLTING SKILLED WORKERS & SUPERVISORS AT SHREE CEMENT, BEAWAR, RAJASTHAN | SHREE CEMENT |
31 | RETRO FITTING WORK OF CEMENT MILL ESP AT MANIKGARH CEMENT CHANDRAPUR , MAHARASTRA. | MANIKGARH CEMENT |
32 | ERECTION & COMISSIONING OF ASH HANDLING SYSTEM AT NEYVELI ‘0’ 250 MH. PROJECT,TAMILNADU | ALSTOM POWER INDIA LTD. |
33 | ERECTION & RETROFITTING OF ESP AT HPCL / NAGAON, ASSAM | ALSTOM POWER INDIA LTD. |
34 | OVERHAULING OF ESP OF UNIT-2 AT MSEB / BTPS, BHUSAWAL, MAHARASTRA. | ALSTOM POWER INDIA LTD. |
35 | OVERHAULING OF ESP OF UNIT-7 AT MSEB / CSTPS, CHANDRAPUR, MAHARASTRA | ALSTOM POWER INDIA LTD. |
36 | RETROFITTING OF 2 NOS, 3 FIELD ESP & SUPPLY & INSTALLATION OF INSULATION OF UNIT-1 AT MSEB / CSTPS, CHANDRAPUR, MAHARASTRA. | ALSTOM POWER INDIA LTD. |
37 | OVERHAULING OF ESP OF UNIT-3 AT MSEB / BTPS, BHUSAWAL, MAHARASTRA | ALSTOM POWER INDIA LTD. |
38 | ERECTION & OVERHAULING OF ESP AT BIRLA COPPER, DAHEJ, GUJRAT | ALSTOM POWER INDIA LTD. |
39 | ERECTION & OVERHAULING OF ESP OF UNIT-3 AT MSEB / CSTPS, CHANDRAPUR,MAHARASTRA | ALSTOM POWER INDIA LTD. |
40 | FABRICATION & ERECTION OF DUCTING OF UNIT- 5 FOR 500 MW BOILER ESP AT MSEB / CSTPS CHANDRAPUR, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. THROUGH ADORE CONTRACTOR CHANDRAPUR |
41 | DISMANTING & RE-ERECTION OF POWER BOILER ESP AT ORIENT PAPER MILLS, SHAHDOL. (M.P.) | ORIENT PAPER MILLS |
42 | OVERHAULING OF SODA RECOVERY BOILER ESP AT SIRPUR PAPER MILLS, KAGOJNAGAR.(A.P.) | ALSTOM PROJECTS INDIAN LTD. |
43 | RETROFITTING & OVERHAULING OF ESP AT KHAPERKHEDA THERMAL POWER STATION MSEB, MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
44 | OVERHAULING OF ESP OF UNIT-4 AT NASIK THERMAL POWER STATION,MSEB, NASIK ROAD, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
45 | OVERHAULING OF ESP OF UNIT-2 AT NASIK THERMAL POWER STATION, MSEB, NASIK ROAD, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
46 | OVERHAULING OF ESP OF UNIT-7 AT KORADI THERMAL POWER STATION MSEB, KORADI, MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
47 | RENOVATION OF RHS ESP (CIVIL & MECHANICAL WORKS) AT HPCL, NAGAON PAPER MILL, NAGAON, ASSAM | ALSTOM PROJECTS INDIA LTD. |
48 | FABRICATION & ERECTION WORKS OF FLUE OUTLET DUCT MODIFICATION AT CESC/TITAGARH. (W.B.) | ALSTOM PROJECTS INDIA LTD. |
49 | FABRICATION , ERECTION & DISMANTLING WORKS OF DUCTING IN UNIT NO. 6 FOR 500MW BOILER ESP AT MSEB/CSTPS, CHANDRAPUR,MAHARASTRA | ALSTOM PROJECTS INDIA LTD. THROUGH ADORE CONTRACTOR CHANDRAPUR |
50 | OVERHAULING OF ESP OF UNIT-7 AT MSEB/CSTPS CHANDRAPUR, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
51 | ERECTION & RETORFITTING OF ESP AT HPCL / NAGAON, ASSAM | ALSTOM POWER INDIA LTD. |
52 | OVERHAULING OF ESP OF UNIT-2 AT MSEB/ BTPS, BHUSAWAL. | ALSTOM POWER INDIA LTD. |
53 | OVERHAULING OF ESP OF UNIT -7 AT MSEB / CTPS, CHANDRAPUR | ALSTOM PROJECTS INDIA LTD. |
54 | RETROFITTING OF 2 NOS. 3 FIELD ESP & SUPPLY & INSTALLATION OF INSULATION OF UNIT-1 AT MSEB / CTPS, CHANDRAPUR | ALSTOM PROJECTS INDIA LTD. |
55 | OVERHAULING OF ESP OF UNIT -3 AT MSEB / BTPS, BHUSAWAL | ALSTOM PROJECTS INDIA LTD. |
56 | ERECTION & OVERHAULING OF ESP AT BIRLA COPPER / DAHEJ, GUJRAT. | ALSTOM PROJECTS INDIA LTD. |
57 | ERECTION & OVERHAULING OF ESP OF UNIT -3 AT MSEB / CTPS, CHANDRAPUR. | ALSTOM PROJECTS INDIA LTD. |
58 | FEBRICATION & ERECTION OF DUCTING OF UNIT -5 FOR 500 MW BOILER ESP AT MSEB / CTPS, CHANDRPUR | ALSTOM PROJECTS INDIA LTD. THROUGH ADORE CONTRACTOR CHANDRAPUR |
59 | DISMANTLING & RE-ERECTION OF POWER BOILER ESP & SODA RECOVER BOILER ESP AT ORIENT PAPER MILLS, SHAHDOL, M.P. | ORIENT PAPER MILLS |
60 | OVERHAULING OF SODA RECOVERY BOILER ESP AT SIRPUR PAPER MILLS, KAJAZ NAGAR, A.P. | ALSTOM PROJECTS INDIA LTD. |
61 | RETROFITTING & OVERHAULING OF ESP AT KHAPERKHEDA THERMAL POWER STATION, MSEB, MAHARASTRAACEMENT | ALSTOM PROJECTS INDIA LTD. |
62 | OVERHAULING OF ESP OF UNIT -4 AT NASIK THERMAL POSER STATION, MSEB NASIK ROAD, MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
63 | OVERHAULING OF ESP. OF UNIT -2 AT NASIK THERMA L POWER STATION, MSEB, NASIK ROAD, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
64 | OVERHAULING OF ESP OF UNITS -7 AT KORADI THERMAL POWER STATION, MSEB, KORADI, MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
65 | CIVIL & MECHANICAL WORKS FOR RENOVATION OF RHSESP AT HPCL, NAGAON PAPER MILL, NAGAON, ASSAM | ALSTOM PROJECTS INDIA LTD. |
66 | ERECTION OF DEDUSTING SYSTEM AT NINL, DUBURI, ORISSA | ALSTOM PROJECTS INDIA LTD. |
67 | FABRICATION & ERECTION WORKS OF FLUE OUTLET DUCT MODIFICATION AT CESC / TITAGARH, W.B | ALSTOM PROJECTS INDIA LTD. |
68 | FABRICATION, ERECTION & DISMANTLING WORKS OF DUCTING IN UNIT NO. 6 FOR 500 MW BOILER ESP AT MSEB, CSTPS, CHANDRAPUR, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. THROUGH ADORE CONTRACTOR CHANDRAPUR |
69 | OVERHAULING OF ESP OF UNIT-7 AT MSEB/CSTPS CHANDRAPUR, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
70 | ERECTION & RETORFITTING OF ESP AT HPCL / NAGAON, ASSAM | ALSTOM POWER INDIA LTD.H |
71 | OVERHAULING OF ESP OF UNIT-2 AT MSEB/ BTPS, BHUSAWAL. | ALSTOM POWER INDIA LTD. |
72 | CIVIL & MECHANICAL WORKS FOR RENOVATION OF RHS ESP, AT HPCL, CACHAR PAPER MILL,CACHAR, ASSAM | ALSTOM PROJECTS INDIA LTD. |
73 | OVERHAULING OF ESP COMPONENTS IN UNIT NO. 7 AT MSEB/CSTPS CHANDRAPUR MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
74 | OVERHAULING OF ESP COMPONENTS IN UNIT NO. 4 AT MSEB, PARLI, TPS,PARLI, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
75 | DISMANTLING & ERECTION OF ESP INTERNALS AT BALLARPUR INDUSTRIES LTD BALPARSHAH, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
76 | FABRICATION & ERECTION OF ESP, GCT, SILO ALONG WITH STRUCTURAL BAGFILTER AT TATA SPONGE IRON LIMITED JODA, ORISSA | THERMAX LIMITED |
77 | REPLACEMENT OF COLLECTING ELECTRODES & OVERHAULING OF ESP IN UNIT NO. 5 AT MSEB/CSTPS, CHANDRAPUR MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
78 | REPLACEMENT OF OLD DAMAGED COLLECTING TUBES BY NEW TUBES AT DETARRER 2 DANKUNI COAL COMPLEX | SOUTH EASTERN COALFIELDS LTD (DANKUNI COAL COMPLEX) |
79 | REPAIR/REPLACEMENT OF ESP PARTS IN U #3 AT SGTPS/ BIRSINGPUR, M.P | ALSTOM PROJECTS INDIA LTD. |
80 | REPAIR/REPLACEMENT OF ESP INTERNALS IN U #5 AT PARLI TPS, PARLI, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
81 | REPAIR/REPLACEMENT OF ESP INTERNALS IN U #1 AT CSTPS/CHANDRAPUR, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
82 | RENOVATION OF EXISITING ESP IN U # 1,2 & 3 WITH ONE FIELD EXTENSION INCLUIDING CIVIL FOUNDATION WORK, MECHANICAL, ELECTRICAL, INSULATOR, PAINTING & COMMISSIONING ASSISTANCE AT DPSCL / CPS, ASANSOL | ALSTOM PROJECTS INDIA LTD. |
83 | DISMANTLING, INSTALLATION AND OVERHAULING OF ESP IN U#1 AT VEDANTA ALUMINA LTD., LANJIGARH, ORISSA | ALSTOM PROJECTS INDIA LTD. |
84 | REPAIR/REPLACEMENT OF ESP INTERNALS OF 210MW OF U#4 AT PARLI TPS, PARLI, MAHARASTRA | MAHAGENCO |
85 | DISMANTLING,FABRICATION & ERECTION (SS & MS WORK) OVERHAULING OF ESP AT BIRLA COPER, DAHEJ GUJARAT | IMECO LTD |
86 | REPLACEMENT OF ESP INTERNALS FOR 210 MW UNIT #3 AT PARLI TPS, PARLI, MAHARASTRA | SUNIL HI-TECH ENGINEERS LTD. |
87 | OVERHAULING OF ESP OF UNIT UNIT # 5,6 & 7 AT CSTPS/CHANDRAPUR, MAHARASTRA | SUNIL HI-TECH ENGINEERS LTD. |
88 | REPLACEMENT OF ESP INTERNALS FOR 210 MW UNIT #4 AT HTPS,CSEB KORBA (W) CG. | ALSTOM PROJECTS INDIA LTD. |
89 | REPLACEMENT AND OVERHAULING OF ESP AT PARAS THERMAL POWER STATION, PARAS, MAHARASTRA | SUNIL HI-TECH ENGINEERS LTD. |
90 | ERECTION AND COMMISSIONING OF CEMENT MILL BRM BAG HOUSE AND COAL MILL BAG FILTER AT M/S DALMIA CEMENT(BHARAT) LTD.,CUDDAPAH, A.P | HIMACHAL ENVIRONMENTAL ENGINEERING CO. (P) LTD. |
91 | FABRICATION & ERECTION OF STRUCTURAL WORKS AT MIS DALMIA CEMENT (BHARAT) LTD. CUDDAPAH, A.P. | M/S DALMIA CEMENT (BHARAT) LTD. |
92 | REPLACEMENT OF ESP INTERNAL FOR 210 MW UNIT #3 OF HTPS, CSEB KORBA (W) CG. | ALSTOM PROJECTS INDIA LTD. |
93 | REPAIRS AND REPLACEMENT OF ESP INTERNALS AS PER SCOPE OF WORK 210 MW UNIT – 3AT TPS PARLI – V. | SUNIL HI TECH ENGINEERS LTD. |
94 | REPLACEMENT OF ESP INTERNALS & OVERHAULING OF ESP AT MIS. ELECTROSTEEL CASTING LIMITED, 30 B. T. ROAD, SUKCHAR, KOLKATA | MS/ ELECTROSTEEL CASTINGS LIMITED |
95 | FABRICATION OF TECHNOLOGICAL STRUCTURES AT KHARAGPUR WORKSHOP OF M/S IMECO LTD. | IMECO LTD. |
96 | REPAIR AND REPLACEMENT OF ESP INTERNALS OF 210 MW. UNIT # 4 AT PARLI, TPS, PARLI, MAHARASTRA. | SUNIL HI TECH ENGINEERS LTD. |
97 | COMPLETE REPAIR AND SERVICEING OF ESP UNIT # 3 AT MSPGCL,CHANDRAPUR, MAHARASTRA. | ALSTOM PROJECTS INDIA LTD. |
98 | STRUCTURAL FABRICATION AND ERECTION WORKS FOR MISC STRUCTURES & STEEL HOPPER, & RAILWAY TRACK LAYING JOB AT MUNDRA BULK TERMINAL WEST PORT, GUJARAT. | M/S. SIMPLEX INFRASTRUCTURES LIMITED |
99 | OVERHAULING OF ESP OF SODA RECOVERY BOILER AT BILT,CHANDRAPUR. | BALLARPUR INDUSTRIES LTD. |
100 | PRE-ASSEMBLY& ERECTION OF BAG FILTERS AT WADI CEMENT WORKS, WADI II EXPANSION PROJECT PHASE – II, WADI, GULBARGA, KARNATAKA. | ACC LIMITED |
101 | FABRICATION, ERECTION & COMMISSIONING OF DUST EXTRACTION UNIT AT JSPL, RAIGARH. | ALSTOM PROJECTS INDIA LTD. |
102 | TOTAL OVERHAULING OF 170 TPH ESP INCLUDING RECTIFICATION, MODIFICATION, STRAIGHTENING & FIELD ALIGNMENT AT JAI BALAJI INDUSTRIES LTD, DURGAPUR, WEST BENGAL. | JAI BALAJI INDUSTRIES LTD. |
103 | REPAIRS AND REPLACEMENT OF ESP INTERNALS OF 210 MW. UNIT # 5 , PARLI, TPS, PARLI, MAHARASTRA. | SUNIL HI TECH ENGINEERS LTD. |
104 | OVERHAULING OF ESP UNIT 2 AT OPGCL, ITPS, ORISSA. | ALSTOM PROJECTS (I) LTD. |
105 | PRE-ASSEMBLY& ERECTION OF BAG FILTERS AT WADI CEMENT WORKS, WADI II EXPANSION PROJECT PHASE – II, WADI, GULBARGA, KARNATAKA. | ACC LIMITED. |
106 | OVERHAULING OF ESP OF UNIT-2 AT NASIK THERMAL POWER STATION, MSEB, NASIK ROAD, MAHARASTRA | ALSTOM PROJECTS INDIA LTD. |
107 | OVERHAULING OF ESP UNIT 2 AT OPGCL,ITPS. | ALSTOM PROJECTS (I) LTD. |
108 | STRUCTURAL FABRICATION AND ERECTION WORKS FOR MISC STRUCTURES & STEEL HOPPER, & RAILWAY TRACK LAYING JOB AT MUNDRA BULK TERMINAL WEST PORT, GUJARAT. | M/S. SIMPLEX INFRASTRUCTURES LIMITED |
109 | FABRICATION, ERECTION & COMMISSIONING OF DUST EXTRACTION UNIT AT JSPL, RAIGARH. | ALSTOM PROJECTS INDIA LTD. |
110 | REPAIR &REPLACEMENT OF ESP INTERNALS AT NALCO 120 MW CPP UNIT -4, ANGUL, ORISSA | SUNIL HI TECH ENGINEERS LTD. |
111 | OVERHAULING OF ESP OF SODA RECOVERY BOILER AT BILT,CHANDRAPUR. | ALSTOM PROJECTS INDIA LTD. |
112 | REPLACEMENT & OVERHAULING OF ESP AT AMBUJA CEMENT, BHATAPARA, RAIPUR, CHATTISGARH. | M/S. ALSTOM PROJECTS INDIA LTD. |
113 | REPAIR AND REPLACEMENT OF ESP (RIK-1) AT TRL KROSAKI REFRACTORIES LIMITED.,BELPAHAR. | TRL KROSAKI REFRACTORIES LIMITED. |
114 | DISMANTLING, ERECTION & COMMISSIONING OF ESP AT ITC, BHADRACHALAM, A.P | ALSTOM PROJECTS INDIA LTD. |
115 | OVERHAULING AND REPLACEMENT OF PARTS IN ESP FOR PARLI TPS UNIT NO. 3. | SUNIL HI TECH ENGINEERS LTD. |
116 | OVERHAULING AND REPLACEMENT OF ESP OF UNIT #1 & 2 AT OPGCL, ITPS, JHARSUGUDA, ODISHA. | ALSTOM PROJECTS INDIA LTD. |
117 | REPLACEMENT OF RECOVERY BOILER # 2 ESP INTERNALS AT TAMILNADU NEWSPRINT AND PAPERS LIMITED., TAMIL NADU. | SUNIL HI TECH ENGINEERS LTD. |
118 | DISMANTLING, ERECTION, TESTING, TRIAL RUN AND COMMISSIONING OF FIVE FIELD ESP- SINTER PLANT TATA STEEL, JAMSHEDPUR. | SUNIL HIT TECH ENGINEERS LTD. |
119 | ANNUAL OVERHAULING OF ESP (PASS A &B) AT LANCOAMARKANTAK POWER LIMITED, KORBA. | SUNIL HIT TECH ENGINEERS LTD. |
120 | ANNAUL OVER HAULING OF ESP UNIT #1 & 2 AT OGPCL, ITPS, JHARSUGUDA, ORISSA. | ALSTOM PROJECTS INDIA LIMITED. |
121 | DEMOLITION, REMOVAL, TRANSPORTATION & STORAGE OF INTERNAL OF ESP AND RESTORING OF FACILITIES FOR WORK OF NTPC, RIHAND, STPP UNIT #1 (500MW) | LODGE COTTRELL INDIA PVT. LTD. |
122 | ERECTION & INSULATION WORK FOR 1.2 PELLET PLANT ESP AT GODAWARI POWER & ISPAT LTD., SILTARA, RAIPUR,C.G. | GODAWARI POWER & ISPAT LTD. |
123 | REPLACEMENT OF COLLECTING PLATES IN ESP UNIT #4 (210 MW) OF NTPC KAHALGAON SUPER THERMAL POWER PROJECT. | ALSTOM PROJECTS INDIA LIMITED. |
Get Started Now
For quality work, successful & timely completion entrust your job to us.
Ready For a Transformation?
- Do you have mechanical fabrication requirements?
- Do you have structural fabrication & erection requirements?